FBR 0.00% 2.4¢ fbr ltd

Ann: FBR Corporate Presentation - July 2020, page-2

  1. 1,655 Posts.
    lightbulb Created with Sketch. 1001
    Key assumptions:
    Hadrian X® manufacturing cost at scale: $1 million
    Hadrian X® crew: 2 people per 12 hour shift
    Hadrian X® useful life: 12 years
    Number of 12 hour shifts per year for Hadrian X®: 252
    Hadrian X® maintenance and fuel cost per year: $175,000
    Hadrian X® laying cost excludes corporate overheads
    Standard double brick house has 351 vertical sqm of wall (237m2 internal facing and 114m2 external facing)
    Manual bricklayers work in a crew of three (two bricklayers and one labourer). Crew lays 1,000 maxibricks per eight-hour day. Equivalent to 108 standard bricks per hour per person
    Manual maxibrick laying cost, taking one to two weeks (laying only) would be $24-$48/sqm wall laid, with the range dependent upon at which point in the supply and demand cycle the
    laying occurs
    Hadrian X® average laying speeds are examples only
 
watchlist Created with Sketch. Add FBR (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.000(0.00%)
Mkt cap ! $106.5M
Open High Low Value Volume
2.6¢ 2.6¢ 2.4¢ $86.26K 3.383M

Buyers (Bids)

No. Vol. Price($)
4 221006 2.4¢
 

Sellers (Offers)

Price($) Vol. No.
2.5¢ 152945 2
View Market Depth
Last trade - 16.10pm 21/05/2024 (20 minute delay) ?
Last
2.4¢
  Change
0.000 ( 3.61 %)
Open High Low Volume
2.6¢ 2.6¢ 2.4¢ 1792763
Last updated 14.18pm 21/05/2024 ?
FBR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.