PEN 1.05% 9.4¢ peninsula energy limited

re: Ann: Feasibility Process Underway at Lanc... "Global mining...

  1. 1,684 Posts.
    re: Ann: Feasibility Process Underway at Lanc... "Global mining engineers and uranium specialists Lyntek Inc (Lyntek) have been appointed by
    Peninsula to design an In-Situ Recovery (ISR) uranium processing plant that is capable of
    processing up to 3 million pounds of U3O8 per annum. It is anticipated that the plant design will
    be completed by the end of February 2010."
    ---------------------------------

    Sounds encouraging

    NK
 
watchlist Created with Sketch. Add PEN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.