M4M 0.00% 2.9¢ macro metals limited

"The plan is for mining operations to be initially conducted on...

  1. 132 Posts.
    lightbulb Created with Sketch. 49
    "The plan is for mining operations to be initially conducted on a 12 hour shift, 350 days of the year, with no production drilling or blasting required due to the soft, friable material. Kogi is expecting this would be essentially a ‘free dig’ operation."

    So a very low cost operation !! combine this with low cost labour and transport costs !!
 
watchlist Created with Sketch. Add M4M (ASX) to my watchlist
(20min delay)
Last
2.9¢
Change
0.000(0.00%)
Mkt cap ! $104.3M
Open High Low Value Volume
3.0¢ 3.0¢ 2.9¢ $215.1K 7.328M

Buyers (Bids)

No. Vol. Price($)
3 1743041 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 834844 5
View Market Depth
Last trade - 16.10pm 20/06/2024 (20 minute delay) ?
M4M (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.