re: Ann: Ferrotungsten metal first fill insta... I quote:
"Hazelwood is pleased to advise that the first fill of ferrotungsten metal has been installed into the furnace at the ATC Ferrotungsten Project. This significant tonnage of ferrotungsten metal will be retained in the furnace during operations to protect the furnace shell from the extreme temperatures associated with the production of the alloy".
In the photo on the left (in the announcement) the fill is behind the inner liner. The guy on the left of the group is standing on the fill.
- Forums
- ASX - By Stock
- Ann: Ferrotungsten metal first fill installed Pro
re: Ann: Ferrotungsten metal first fill insta... I...
Featured News
Add HAZ (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
BTH
BIGTINCAN HOLDINGS LIMITED
David Keane, Co-Founder & CEO
David Keane
Co-Founder & CEO
Previous Video
Next Video
SPONSORED BY The Market Online