SUM 5.45% 26.0¢ summit minerals limited

Ann: Field Exploration Commences at Ahmed Antimony Project, page-47

  1. 1,851 Posts.
    lightbulb Created with Sketch. 603
    with all these photos showing stibnite trends, if we can verify direct shipping ore grade over larger areas (does anyone the treshold for DSO grade?), this can be a winner!
 
watchlist Created with Sketch. Add SUM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.