MLS 0.00% 2.1¢ metals australia ltd

Ann: Field Exploration Commences - Lac du Marcheur Cobalt Project, page-13

  1. 79 Posts.
    lightbulb Created with Sketch. 1
    Its a shame they didnt give a timeline on followup drilling. The quarterly was a little unclear but it sounds like this quarter.

    Would be nice if they had kept the drill crew there and started drilling the C2 conductor while awaiting 2nd phase results. Then upon getting results geos snapped into action and developed the followup campaign and its already started? They might of even had a rough idea from drill cores. Wishful thinking
    Last edited by SunnyD: 09/08/17
 
watchlist Created with Sketch. Add MLS (ASX) to my watchlist
(20min delay)
Last
2.1¢
Change
0.000(0.00%)
Mkt cap ! $14.85M
Open High Low Value Volume
2.2¢ 2.2¢ 2.1¢ $22.14K 1.051M

Buyers (Bids)

No. Vol. Price($)
5 2410190 2.1¢
 

Sellers (Offers)

Price($) Vol. No.
2.2¢ 133499 2
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
2.1¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
2.2¢ 2.2¢ 2.1¢ 999891
Last updated 15.54pm 10/05/2024 ?
MLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.