@Sugar What on earth have management done so far to get you offside.
I would have thought with the current position we find our selves in you should be licking their backsides.
Not to forget I reckon this SPP will be well and truly taken up which should show the confidence in management as well as the projects themselves.
- Forums
- ASX - By Stock
- PSL
- Ann: Field Personnel on Site at Grace Project
Ann: Field Personnel on Site at Grace Project, page-38
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PSL (ASX) to my watchlist
|
|||||
Last
2.6¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.85M |
Open | High | Low | Value | Volume |
2.6¢ | 2.6¢ | 2.6¢ | $311 | 11.97K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 17979 | 2.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 1000000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 17979 | 0.022 |
1 | 300000 | 0.016 |
1 | 500000 | 0.015 |
2 | 231055 | 0.011 |
1 | 200000 | 0.010 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 1000000 | 1 |
0.026 | 188021 | 1 |
0.027 | 627739 | 2 |
0.028 | 739810 | 3 |
0.029 | 402576 | 1 |
Last trade - 10.06am 09/08/2024 (20 minute delay) ? |
Featured News
PSL (ASX) Chart |