i was told the cree are pissed off with the 18m high dams ruining the landscape. Permitting will stall the project well beyond 8-10 years.
Capex will reach around 1.5 billion and cause major dilution for existing holders. By the time PMET hits a decent marketcap many years down the track, sp will not bring the same value for long holders.
I was also told the cree will be pleased to get the jobs back around the already permitted renard hence increasing the likelyhood of remaining permits at Adina.
- Forums
- ASX - By Stock
- Ann: Final 2023 Drill Hole Results for the CV13 & CV9 Pegmatites
i was told the cree are pissed off with the 18m high dams...
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PMT (ASX) to my watchlist
|
|||||
Last
57.0¢ |
Change
-0.060(9.52%) |
Mkt cap ! $355.4M |
Open | High | Low | Value | Volume |
61.0¢ | 61.0¢ | 55.0¢ | $5.882M | 10.26M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6647 | 56.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
57.0¢ | 11541 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6647 | 0.565 |
2 | 24000 | 0.555 |
9 | 152534 | 0.550 |
1 | 36000 | 0.545 |
3 | 103751 | 0.540 |
Price($) | Vol. | No. |
---|---|---|
0.570 | 11541 | 1 |
0.580 | 7000 | 1 |
0.590 | 4000 | 1 |
0.595 | 44285 | 2 |
0.600 | 78717 | 3 |
Last trade - 16.10pm 21/06/2024 (20 minute delay) ? |
Featured News
PMT (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online