i was told the cree are pissed off with the 18m high dams ruining the landscape. Permitting will stall the project well beyond 8-10 years.
Capex will reach around 1.5 billion and cause major dilution for existing holders. By the time PMET hits a decent marketcap many years down the track, sp will not bring the same value for long holders.
I was also told the cree will be pleased to get the jobs back around the already permitted renard hence increasing the likelyhood of remaining permits at Adina.
- Forums
- ASX - By Stock
- Ann: Final 2023 Drill Hole Results for the CV13 & CV9 Pegmatites
i was told the cree are pissed off with the 18m high dams...
-
- There are more pages in this discussion • 36 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PMT (ASX) to my watchlist
|
|||||
Last
56.0¢ |
Change
-0.005(0.88%) |
Mkt cap ! $349.2M |
Open | High | Low | Value | Volume |
56.5¢ | 57.0¢ | 53.5¢ | $2.302M | 4.138M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 102219 | 55.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
56.5¢ | 2250 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 102219 | 0.550 |
1 | 40000 | 0.545 |
1 | 27000 | 0.540 |
1 | 4467 | 0.535 |
5 | 29908 | 0.530 |
Price($) | Vol. | No. |
---|---|---|
0.565 | 2250 | 1 |
0.570 | 11000 | 1 |
0.575 | 60000 | 2 |
0.585 | 31573 | 2 |
0.590 | 22000 | 1 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
PMT (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online