With their small uneconomical resources, nice try mate,
tell me where the downstream is going to be for those two small assets? no point having a mine if you don't have the chemical processing capacity, it has to be done at once.. building the upstream and downstream industry from scratch. Without a PMT sized asset, there is no industry in that jurisdiction as the downstream capex is too large without the stock feed... ; )
- Forums
- ASX - By Stock
- Ann: Final 2023 Drill Hole Results for the CV13 & CV9 Pegmatites
With their small uneconomical resources, nice try mate,tell me...
- There are more pages in this discussion • 176 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PMT (ASX) to my watchlist
(20min delay)
|
|||||
Last
90.0¢ |
Change
-0.095(9.55%) |
Mkt cap ! $536.1M |
Open | High | Low | Value | Volume |
89.5¢ | 94.0¢ | 89.0¢ | $6.615M | 7.317M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 335151 | 90.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
91.0¢ | 69500 | 5 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 526660 | 0.900 |
4 | 338545 | 0.895 |
7 | 137591 | 0.890 |
6 | 258500 | 0.885 |
10 | 174820 | 0.880 |
Price($) | Vol. | No. |
---|---|---|
0.910 | 69500 | 5 |
0.915 | 40587 | 4 |
0.920 | 7334 | 1 |
0.925 | 15000 | 2 |
0.935 | 31059 | 3 |
Last trade - 16.10pm 22/05/2024 (20 minute delay) ? |
|
|||||
Last
90.0¢ |
  |
Change
-0.095 ( 10.1 %) |
|||
Open | High | Low | Volume | ||
89.5¢ | 93.5¢ | 89.0¢ | 1894161 | ||
Last updated 15.59pm 22/05/2024 ? |
Featured News
PMT (ASX) Chart |
The Watchlist
RDN
RAIDEN RESOURCES LIMITED
Dusko Ljubojevic, MD
Dusko Ljubojevic
MD
SPONSORED BY The Market Online