simple people, there is always a slump between good grades and getting the stuff out of the ground and cash flow, its the life cycle of all junior miners. Until the plant is half built, the time table is being adhered to and a date 12m out for gold sales, the share price can stay low.
- Forums
- ASX - By Stock
- CHZ
- Ann: Final Area D results from 20,000m drill program
Ann: Final Area D results from 20,000m drill program, page-65
-
- There are more pages in this discussion • 10 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)