CBY 7.69% 5.6¢ canterbury resources limited

Ann: Final Assays from 2023 Drilling at the Briggs Copper Project, page-12

  1. 56 Posts.
    lightbulb Created with Sketch. 3
    Im assuming CBY going up while ALM not moving due to need to raise funds on ALM side? High grade is needed here, hopefully some structurally controlled high grade zones uet to be defined. Alot of stranded copper assets would greatly benefit from base metal plant in this part of QLD. Mt Morgan plant long gone
 
watchlist Created with Sketch. Add CBY (ASX) to my watchlist
(20min delay)
Last
5.6¢
Change
0.004(7.69%)
Mkt cap ! $10.13M
Open High Low Value Volume
5.9¢ 5.9¢ 5.4¢ $1.384K 23.94K

Buyers (Bids)

No. Vol. Price($)
1 48257 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.6¢ 7528 1
View Market Depth
Last trade - 15.38pm 28/05/2024 (20 minute delay) ?
CBY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.