CBY 10.3% 5.2¢ canterbury resources limited

Im assuming CBY going up while ALM not moving due to need to...

  1. 56 Posts.
    lightbulb Created with Sketch. 3
    Im assuming CBY going up while ALM not moving due to need to raise funds on ALM side? High grade is needed here, hopefully some structurally controlled high grade zones uet to be defined. Alot of stranded copper assets would greatly benefit from base metal plant in this part of QLD. Mt Morgan plant long gone
 
watchlist Created with Sketch. Add CBY (ASX) to my watchlist
(20min delay)
Last
5.2¢
Change
-0.006(10.3%)
Mkt cap ! $8.931M
Open High Low Value Volume
5.8¢ 5.8¢ 5.2¢ $5.305K 99.59K

Buyers (Bids)

No. Vol. Price($)
1 48257 5.2¢
 

Sellers (Offers)

Price($) Vol. No.
5.9¢ 510 1
View Market Depth
Last trade - 15.45pm 27/05/2024 (20 minute delay) ?
CBY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.