The timeline for key elements of the PEA that remain outstanding is as follows:
• Marketing studies - May
• Mineral resource estimate - June
• Ore and concentrate transport and logistics studies - July
• Mining study - July
• Processing study, including finalising process plant design and scale - August
• Capital and operating cost estimate and financial analysis – September
• Reporting of final PEA results - September.
- Forums
- ASX - By Stock
- AZS
- Ann: Final Drill Results from Oposura West Zone
Ann: Final Drill Results from Oposura West Zone, page-5
-
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)