RedDirtRipper: The offtake partner never said it was the product, what they did say was the wet screen would reduce the overall costs and increase the capacity, it also had to do with the size of the product, ie, wanting a larger mesh size....Also, this wet screen will be invaluable for our Tin and Tungsten which will also commence during the Iron-Ore extraction, of which we have the same off take partner.
- Forums
- ASX - By Stock
- Ann: Final Funding Secured for Riley Iron Ore Mine
RedDirtRipper: The offtake partner never said it was the...
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VMS (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.002(8.33%) |
Mkt cap ! $58.93M |
Open | High | Low | Value | Volume |
2.5¢ | 2.7¢ | 2.5¢ | $277.5K | 10.83M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 324999 | 2.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.7¢ | 4945875 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 324999 | 0.026 |
15 | 3510387 | 0.025 |
4 | 1148709 | 0.024 |
7 | 1928284 | 0.023 |
11 | 3053987 | 0.022 |
Price($) | Vol. | No. |
---|---|---|
0.027 | 4945875 | 14 |
0.028 | 3311443 | 10 |
0.029 | 1950398 | 9 |
0.030 | 4447772 | 12 |
0.031 | 1643191 | 4 |
Last trade - 16.10pm 27/05/2024 (20 minute delay) ? |
|
|||||
Last
2.6¢ |
  |
Change
0.002 ( 8.33 %) |
|||
Open | High | Low | Volume | ||
2.5¢ | 2.6¢ | 2.5¢ | 2742518 | ||
Last updated 15.26pm 27/05/2024 ? |
Featured News
VMS (ASX) Chart |