PLS 0.69% $2.88 pilbara minerals limited

I think what @dfs1 says kinda makes sense to me. There's always...

  1. 493 Posts.
    lightbulb Created with Sketch. 30
    I think what @dfs1 says kinda makes sense to me. There's always a risk for a pilot plant before they're ready for commercial production. Have a look at PLS on their early days of plant production. They even had to do a special project to optimise the plant and reducing waste.

    The Project Director of this midstream has to be discipline enough with the scope and must have good resources to realise the intention to succeed.
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$2.88
Change
-0.020(0.69%)
Mkt cap ! $8.671B
Open High Low Value Volume
$2.87 $2.90 $2.84 $9.813M 3.422M

Buyers (Bids)

No. Vol. Price($)
30 266681 $2.87
 

Sellers (Offers)

Price($) Vol. No.
$2.88 215040 33
View Market Depth
Last trade - 11.02am 19/08/2024 (20 minute delay) ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.