DRE dreadnought resources ltd

Based on the information provided in the announcement, here's an...

  1. 3,524 Posts.
    lightbulb Created with Sketch. 622

    Based on the information provided in the announcement, here's an analysis of potential free cash flow using toll treating:

    Revenue Calculation

    • Total resource: 14,900 oz @ 6.8 g/t Au
    • Gold price: AUD$5,100/oz
    • Gross revenue: 14,900 oz × AUD$5,100/oz = AUD$75.99 million

    Key Cost Components

    1. Mining Costs:

    • Small-scale open pit mining for near-surface transition material: ~AUD$40-60/tonne
    • Underground mining for fresh material: ~AUD$120-180/tonne

    2. Toll Treatment Costs:

    • Processing costs: ~AUD$35-50/tonne
    • Transport costs to nearby mill: ~AUD$15-25/tonne
    • Recovery loss (assuming 90-95% recovery): 5-10% of contained gold

    3. Royalties:

    • WA state royalty (2.5%): ~AUD$1.90 million
    • 1% NSR mentioned in the document: ~AUD$0.76 million

    Estimated Cash Flow Calculation

    For the total resource (68,400 tonnes):

    • Mining costs: ~AUD$8.2-12.3 million (average ~AUD$150/tonne for the predominant fresh material)
    • Toll treatment + transport: ~AUD$3.4-5.1 million (~AUD$50-75/tonne)
    • Metallurgical recovery (assuming 92%): ~14,900 × 0.92 = ~13,708 oz
    • Recovered gold value: ~AUD$69.91 million
    • Royalties: ~AUD$2.66 million
    • Additional overheads, site costs and administration: ~AUD$2-3 million

    Estimated Free Cash Flow:AUD$69.91M - AUD$8.2-12.3M - AUD$3.4-5.1M - AUD$2.66M - AUD$2-3M = AUD$46.85-54.65 million

    Key Considerations:

    1. High-grade nature (6.8 g/t Au) provides robust economics for toll treating
    2. The deposit's near-surface characteristics would allow for lower initial mining costs
    3. The resource contains primarily fresh material (66,500 tonnes of 68,400 total tonnes)
    4. Small resource size makes toll treating more economical than building a standalone plant
    5. The potential for resource expansion could improve project economics

    This analysis suggests a strong potential free cash flow of approximately AUD$47-55 million before tax, or about AUD$3,150-3,670 per ounce of gold recovered. However, actual results would depend on final metallurgical recoveries, contract terms with the toll treatment facility, and the mining method selected.


 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.2¢
Change
-0.001(7.69%)
Mkt cap ! $60.95M
Open High Low Value Volume
1.3¢ 1.3¢ 1.1¢ $66.63K 5.550M

Buyers (Bids)

No. Vol. Price($)
3 3326066 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 5224034 16
View Market Depth
Last trade - 16.10pm 17/06/2025 (20 minute delay) ?
DRE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.