DRE dreadnought resources ltd

Created a PFS in Claude too:CLAUDE AI. : PFS For MetskesAlso a...

  1. 3,521 Posts.
    lightbulb Created with Sketch. 619
    Created a PFS in Claude too:

    CLAUDE AI. : PFS For Metskes

    Also a pit plan:


    https://hotcopper.com.au/data/attachments/6940/6940113-a730734fd515a1274853594101275bf9.jpg


    I've created a pit plan diagram for the Metzke's Find Gold Project based on the information from the Pre-Feasibility Study. This plan view diagram shows the following key elements:

    1. Pit Layout:
      • The overall pit dimensions (approximately 150m long by 90m wide)
      • Multiple pit benches showing the staged mining approach
      • The pit floor at the final mining depth
    2. Mining Infrastructure:
      • The haul road spiral design with access from the eastern side
      • Underground portal location positioned to access deeper mineralization
      • ROM (Run of Mine) pad location for ore stockpiling
      • Waste rock storage facility positioned to minimize haulage distances
    3. Geological Features:
      • The main gold-bearing lode (shown in red)
      • Secondary mineralized structures
      • The Proterozoic dyke that intersects the northern portion of the deposit
    4. Technical Elements:
      • Cross-section line (A-A') reference
      • Scale bar for dimensional reference
      • North arrow for orientation
      • Site buildings including office and workshop

    The pit design incorporates the geotechnical parameters specified in the PFS, with appropriate bench heights, berm widths, and overall pit slope angles for both the transition and fresh rock material. The pit is designed to efficiently extract the near-surface portion of the resource before transitioning to underground mining for the deeper mineralization.


 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
1.2¢
Change
-0.001(7.69%)
Mkt cap ! $60.95M
Open High Low Value Volume
1.3¢ 1.3¢ 1.1¢ $66.24K 5.518M

Buyers (Bids)

No. Vol. Price($)
3 1898226 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 5294662 19
View Market Depth
Last trade - 15.27pm 17/06/2025 (20 minute delay) ?
DRE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.