Yes could expect Primero on-site now: survey control and site layout setup and logistics.Me thinks the first 6 containers arriving will be footings steel rebar and cages. The "frustrating footings" stage of dig, form up, steel reinforcing, concrete pour, wait 1-2 days for final set, strip forms and move and do it all again. Frustrating (??) because you work flat out for 3-4 weeks, turn around and look at blobs of concrete sitting on the ground, and then in come the steel erectors with 1 crane, a few columns and beams and in a couple of days it looks like something is happening.At the Coburn mine concreting is 90+% complete, so my guess is that the carpenters, steel fixers and concreters will be very close at Finniss.As for Lucas, hammer and tongs but with a fair bit of wheel spinning. No despair, "the cavalary" has arrived, excavator(s) and 12 Cat777 dump trucks. Will be able to eat into the 6M bcm overburden in a matter of months and still stockpile ample product for processing. (For me, a bit baffled why 12 trucks and not say 8-9 trucks, but hey am not in the slightest worried. Maybe @annon69 has some comment? Is something else afoot? )
Will be interested to see this progress, the Sentinel satelitte will tell all. From the sat pic and imaging a clock face, at 9 oclock the long rectangle should grow to the south, and I think second stockpile at 5-6 oclock, could the red/orange tracks be haul roads?So definitely exciting 5-6 months ahead.
PS: @Rajiv59 any idea of the ship name for the containers? Would be interested to plot its course. What with @acouch swanning it up in the high country next week, how do I get my daily fix?
- Forums
- ASX - By Stock
- Ann: Finniss Lithium Project Exploration Update
Yes could expect Primero on-site now: survey control and site...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CXO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.8¢ |
Change
-0.002(2.22%) |
Mkt cap ! $188.0M |
Open | High | Low | Value | Volume |
9.0¢ | 9.0¢ | 8.6¢ | $1.020M | 11.56M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 611323 | 8.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 680228 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 611323 | 0.088 |
17 | 1612149 | 0.087 |
22 | 1289891 | 0.086 |
48 | 2256690 | 0.085 |
17 | 951986 | 0.084 |
Price($) | Vol. | No. |
---|---|---|
0.089 | 680228 | 4 |
0.090 | 2017675 | 23 |
0.091 | 253724 | 4 |
0.092 | 1470351 | 7 |
0.093 | 660044 | 5 |
Last trade - 16.10pm 19/06/2024 (20 minute delay) ? |
Featured News
CXO (ASX) Chart |
The Watchlist
P.HOTC
HotCopper
Don Currie, CEO
Don Currie
CEO
Previous Video
Next Video
SPONSORED BY The Market Online