With the extensional drilling of 10,000m I expect that we will in the end have 1 set of holes every 750m-1km to the West over the 10-12km being tested (also looks to be the case in the map in the drilling program announcement). Is that spacing sufficient to include the western extension in any resource upgrade as inferred or will it require further drilling to be included? Being oil trash, hard rock is not my area so just curious, I expect it's too sparse to be included and will require further drilling, right? Just trying to manage expectations is all!
- Forums
- ASX - By Stock
- AML
- Ann: First Assays from Walford Creek 2018 drilling campaign
Ann: First Assays from Walford Creek 2018 drilling campaign, page-11
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AML (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $5.482M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
AML (ASX) Chart |
Day chart unavailable