How much cash hit the bank?
Are these guys going to run out of money?
Cash at January 1 = A$10M
Expenditure last quarter = A$15M
Increasing production ==> increasing cost, say $20M this quarter.
So to keep the wolves from the door they have to produce A$10M - A$15M worth of copper. I'll ignore gold for this calc.
Say they net 70% of the value of the copper in con
Copper price = U$3.88 / lb
XR = 1.52
So they need to sell
10,000,000 / 70% / 3.88 / 1.52 / 2204 - 15,000,000 / 70% / 3.88 / 1.52 / 2204 tonnes of copper
or 1100 - 1650 tonnes of copper
if mill recovery is 90% and ore grade is 1% then they need to treat
1100 / 90% / 1% - 1650 / 90% / 1%
120 - 180kt of ore this quarter.
Seems a close race to me.
- Forums
- ASX - By Stock
- Ann: First Cash Received from Copper Production
How much cash hit the bank?Are these guys going to run out of...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.7¢ |
Change
0.005(6.94%) |
Mkt cap ! $161.2M |
Open | High | Low | Value | Volume |
7.4¢ | 7.8¢ | 7.4¢ | $323.0K | 4.257M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 897452 | 7.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.8¢ | 648632 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 897452 | 0.076 |
2 | 110000 | 0.075 |
9 | 815540 | 0.074 |
5 | 783150 | 0.073 |
12 | 840688 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.078 | 648632 | 3 |
0.079 | 1034339 | 3 |
0.080 | 1330009 | 5 |
0.081 | 600383 | 5 |
0.082 | 510190 | 6 |
Last trade - 15.59pm 10/05/2024 (20 minute delay) ? |
|
|||||
Last
7.7¢ |
  |
Change
0.005 ( 6.94 %) |
|||
Open | High | Low | Volume | ||
7.4¢ | 7.8¢ | 7.4¢ | 1423333 | ||
Last updated 15.57pm 10/05/2024 ? |
Featured News
HGO (ASX) Chart |