How much cash hit the bank?
Are these guys going to run out of money?
Cash at January 1 = A$10M
Expenditure last quarter = A$15M
Increasing production ==> increasing cost, say $20M this quarter.
So to keep the wolves from the door they have to produce A$10M - A$15M worth of copper. I'll ignore gold for this calc.
Say they net 70% of the value of the copper in con
Copper price = U$3.88 / lb
XR = 1.52
So they need to sell
10,000,000 / 70% / 3.88 / 1.52 / 2204 - 15,000,000 / 70% / 3.88 / 1.52 / 2204 tonnes of copper
or 1100 - 1650 tonnes of copper
if mill recovery is 90% and ore grade is 1% then they need to treat
1100 / 90% / 1% - 1650 / 90% / 1%
120 - 180kt of ore this quarter.
Seems a close race to me.
- Forums
- ASX - By Stock
- Ann: First Cash Received from Copper Production
How much cash hit the bank?Are these guys going to run out of...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HGO (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $172.7M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 20015 | 8.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.3¢ | 58700 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 20015 | 0.083 |
4 | 351132 | 0.082 |
2 | 298351 | 0.081 |
13 | 847100 | 0.080 |
3 | 657987 | 0.079 |
Price($) | Vol. | No. |
---|---|---|
0.083 | 58700 | 2 |
0.084 | 407818 | 2 |
0.085 | 180772 | 1 |
0.086 | 221516 | 3 |
0.087 | 1092242 | 4 |
Last trade - 09.04am 28/05/2024 (20 minute delay) ? |
Featured News
HGO (ASX) Chart |
Day chart unavailable