Drill hole WCS006 has intersected 23.8 metre down-hole at an average grade of 135.0 g/t silver and 7.32% zinc (105.6m to 129.4m) at the Webbs Consol Silver Project’s Main Shaft Prospect. Estimated true width is 12.2 metres. This is located within a broader 27.5 metre down-hole interval at an average grade of 118.1g/t silver and 6.52% zinc (104.6m to 132.1m). Estimated true width is 14.2 metres.
Follow-up Drill hole WCS007 has intersected 24.1 metre down-hole of sulphide mineralisation containing an estimated 15% sphalerite ((Zn,Fe)S) and 1% galena (PbS) (122.9m to 147.0m) proving down dip continuity of Webbs Consol Main Shaft prospect mineralisation. See Photo 1, Figure 1 and Table 2. Estimated true width is 10.4 metres. Significant silver mineralisation is also anticipated in assays.
- Forums
- ASX - By Stock
- Ann: First drill assays received for Webbs Consol Silver Project
Drill hole WCS006 has intersected 23.8 metre down-hole at an...
-
- There are more pages in this discussion • 121 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LDR (ASX) to my watchlist
|
|||||
Last
7.5¢ |
Change
0.001(1.35%) |
Mkt cap ! $8.008M |
Open | High | Low | Value | Volume |
7.5¢ | 7.6¢ | 7.5¢ | $5.445K | 72.47K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2500 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.7¢ | 38425 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2500 | 0.075 |
1 | 100000 | 0.074 |
1 | 150000 | 0.072 |
2 | 120000 | 0.071 |
3 | 26457 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.077 | 38425 | 1 |
0.080 | 50000 | 1 |
0.090 | 30000 | 1 |
0.095 | 7000 | 1 |
0.100 | 100000 | 2 |
Last trade - 15.53pm 05/07/2024 (20 minute delay) ? |
Featured News
LDR (ASX) Chart |