OZM 0.00% 6.4¢ ozaurum resources limited

I think the problem was that the vendors have excised the the...

  1. 1,355 Posts.
    lightbulb Created with Sketch. 219
    I think the problem was that the vendors have excised the the main workings in the permit. This 833.033/2023 permit was processed in Dec 23 and is right over the workings. It looks like TCB suggesting dodgy dealings by OZM was way off the mark.

    https://hotcopper.com.au/data/attachments/6269/6269720-601379d5a02e4017fc4271a2e5cf1a43.jpg
    https://hotcopper.com.au/data/attachments/6269/6269734-e1267b697ec3b273e5fb063f313ac0dc.jpg

    It was a flashy but small scale project anyways.

    Time to start work in elephant country with the Nb & REE ground. Hopefully an update is not far away. Come on AP!

 
watchlist Created with Sketch. Add OZM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.