    Well the timeline fits that theory. The last Salitre tenement was started 10 June. How long does it take to traverse and collect chips and soils? A couple of days max? Say done on 12 June then swing to Boca to fire up the rig again. Plus wasn't the rig refurbed? So if it needed a part I'm thinking it had to be on back order so fly back to get it and I'd say it was only a simple plug and play part. So maybe fixed within a day and fire rig up on 14 June, hence X post. The other thing that may well have slowed things down, training up of different crews (assuming they weren't pros). All speculation of course!
 