am i right in saying this is grade control drilling fo iguana open pit that was previoulsy assessed at 1.3 g/t from memory or thereabouts?
wse could be seeing significant changes to the MRE and massive upside to margin.. and possibly expansion of the pit design if there is lift in grade outside the current pit model.. (i say that without having looked in detail)
am i right in saying this is grade control drilling fo iguana...
Add to My Watchlist
What is My Watchlist?