DRE 4.35% 2.2¢ dreadnought resources ltd

Interpreted drilling for the 5 days to July 13 is 10-12 holes. I...

  1. 3,027 Posts.
    lightbulb Created with Sketch. 8070
    Interpreted drilling for the 5 days to July 13 is 10-12 holes. I may not have posted this but the sequence seems to be different from that mentioned by DT after the drill left Illaara (my take anyway). Money to Yin to Carbonatite and perhaps back to infill Yin Ironstones if results were promising. Results were too quick for assays so PXRF may have been implied.

    The main difference is there already appears to have be infill on some 100m spaced lines (8 possible holes on 7350 -400N, 600n and 7351000N as the most obvious).
    I take this as a positive for what they are seeing and analysing - may not be.

    https://hotcopper.com.au/data/attachments/4509/4509431-edbc68d1b2234e3ba1b5f8b41fbfcb67.jpg

    Line 7350800N (? on map above) is obscured by the road access to some extent but does not appear to have been drilled yet.

    Of the 4 sites in the far SW I am fairly certain one on each line is drilled but the other two may not be.

    10-12 sites drilled seems to be around the average to date for a 5 day period.
    =================
    Site preparation was completed in the Y3 area with another 3 or 4 being done.

    https://hotcopper.com.au/data/attachments/4509/4509453-b4945955f06f80b1d08415ab56cf539a.jpg

    Possible access routes are shown in thin white lines (Tenement boundary across middle of image). The black dots are early drill holes for Uranium with some hints of REEs.

    ===================================
    I took a close look for other site prep but found nothing in Yin/Carbonatite area. [Nor Booka, High Range or Lumpy's - checked but didn't expect anything].
    There are enough prepared sites to keep the rig going for perhaps another two weeks especially if infill keeps being done. After that the rig needs some sites to go to.
    They need to be careful with some sites at C1-5 not to prepare them on Hastings ground.

    https://hotcopper.com.au/data/attachments/4509/4509460-977ec275a02ee671dbab144e4751b118.jpg


    Hastings has a Miscellaneous license that extends into DRE ground where C1 magnetics are located. There is an area there where some digging has taken place over the years. Most likely for road building material. Might be interesting if there is carbonatite under it!!

    https://hotcopper.com.au/data/attachments/4509/4509465-f2a58dceeea1d0122d23c08e145ede11.jpg

    Last edited by salpetie: 15/07/22
 
watchlist Created with Sketch. Add DRE (ASX) to my watchlist
(20min delay)
Last
2.2¢
Change
-0.001(4.35%)
Mkt cap ! $77.28M
Open High Low Value Volume
2.3¢ 2.3¢ 2.2¢ $46.86K 2.038M

Buyers (Bids)

No. Vol. Price($)
9 2178220 2.2¢
 

Sellers (Offers)

Price($) Vol. No.
2.3¢ 100000 1
View Market Depth
Last trade - 16.10pm 09/07/2024 (20 minute delay) ?
DRE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.