People do realise they produced this in 3.6 days, not a week. Even their report said 4 days. So times this results by x2 per week @ 15 tonne per hour and times x3 when they reach 25 tonne per hour. 25T per hr is a 66% increase in production. So plenty of upside.
They are working 24hrs 7 days week. how many day of production will we see next?
“The gold pour yesterday comprised three doré bars weighing collectively approximately 22kg of gold and silver bullion*. This bullion was recovered from gravity, ILR (Intensive Leach Reactor) and CIL (Cyanide in Leach) extraction at Maroon’s Black Jack Processing Plant over the past four days. During this period approximately 1,300 tonnes of ore with an average head grade of approximately 15g/t gold has been crushed, milled and processed through Maroon’s Plant. Processing rates are currently approximately 15 tonnes per hour with this rate to be steadily increased over the coming weeks with 25 tonnes per hour being targeted. Final processing rates achieved will be dependent on feed grades and ongoing metallurgical performance including recovery.”
i have no intention of letting any of my shares. One thing I would like to know it ratio of gold to silver to help understand a value but definitely not concerned
- Forums
- ASX - By Stock
- Ann: First Gold Pour from Agate Creek Gold Project
People do realise they produced this in 3.6 days, not a week....
Featured News
Add SVG (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.183M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
SVG (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online