When your running commisioning on a brand new plant there is always going to be some tweeking.
Every piece of gear has to be ticked off meticulously to monitor for design parameters to be met.
The handover of the plant by the builders must be thoroughly checked and signed off.
But as there release back in September stated.
The crushing circuit was operating at 250 TPH at times (2.0MTPA)
The ball mill has achieved throughput of 125 tph during start up that's at nameplate capacity.
Pretty sure if any major hurdles have been hit we would know because that would get them in strife with the ASX as reporting rulings.
Share price has big end of town manipulation written all over it this is the ASX casino boys and girls they are the market makers we are the market players.
Not always a level playing field as the house always has the advantage.
Just play the game the same buy the dips.
Grade is king in gold projects as they say and we will soon be wearing the crown.
Darren Strarlow is a very astute operater ex NST look how that turned into a world class juggernaut.
Next week the Quartey will be out and i think it should be better than good and just maybe outstanding.
HOLD TIGHT.
- Forums
- ASX - By Stock
- BGL
- Ann: First gold poured at Bellevue Gold Project
Ann: First gold poured at Bellevue Gold Project, page-147
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BGL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.30 |
Change
0.005(0.39%) |
Mkt cap ! $1.657B |
Open | High | Low | Value | Volume |
$1.27 | $1.30 | $1.25 | $9.627M | 7.524M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 400 | $1.29 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.30 | 158111 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 400 | 1.290 |
7 | 196143 | 1.280 |
5 | 108245 | 1.275 |
1 | 9795 | 1.270 |
3 | 11335 | 1.265 |
Price($) | Vol. | No. |
---|---|---|
1.295 | 158111 | 3 |
1.300 | 171812 | 7 |
1.305 | 175446 | 4 |
1.310 | 209497 | 7 |
1.315 | 60187 | 3 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
BGL (ASX) Chart |