As I thought, the port decided to do maintenance which leads me to believe that the reduction of load rate which we saw on the graph was due to the loader having problems so the port decided to proceed with maintenance and repair and our board have just shown market diplomacy by not pointing the finger.
By the port ensuring we have loading preference to me is an indication of where the problem was.
AIMO DYOR
- Forums
- ASX - By Stock
- GWR
- Ann: First Iron Ore Shipment Update - C4 Deposit
Ann: First Iron Ore Shipment Update - C4 Deposit, page-5
-
- There are more pages in this discussion • 43 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.4¢ |
Change
0.006(7.69%) |
Mkt cap ! $26.98M |
Open | High | Low | Value | Volume |
7.8¢ | 8.4¢ | 7.8¢ | $7.483K | 93.92K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.5¢ | 562194 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 145454 | 0.079 |
2 | 21798 | 0.078 |
1 | 83520 | 0.077 |
2 | 76666 | 0.075 |
1 | 12000 | 0.073 |
Price($) | Vol. | No. |
---|---|---|
0.085 | 562194 | 4 |
0.100 | 91375 | 2 |
0.110 | 5500 | 1 |
0.115 | 15384 | 1 |
0.130 | 50000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |