AUN 7.32% 3.8¢ aurumin limited

FIRST PASS DRILLING ON NEW TARGETS COMPLETED Aurumin Limited...

  1. 25,433 Posts.
    lightbulb Created with Sketch. 1192
    FIRST PASS DRILLING ON NEW TARGETS COMPLETED
    Aurumin Limited (ASX: AUN) (“Aurumin” or the “Company” is pleased to announce drilling has been completed at
    the Company’s 100% owned, 881koz Au Central Sandstone Project, located 520km north east of Perth. The Project
    is part of the Company’s Sandstone Operations, which also includes the Birrigrin and Johnson Range Projects, and
    has a total Resource of 946koz Au.
    Highlights
    Reverse Circulation (RC) drilling has been completed with 38 holes and 3888 metres drilled.
     7 new open pit targets tested with first pass exploration drilling
     Drilling targeted multiple depositional models and styles including porphyry/intrusive hosted vein style,
    banded iron hosted and structural shear style hosted mineralisation in mafic and ultramafic units, in line
    with announcement on 3 April 2024 6
     Follow up drilling will be fast tracked subject to results.
     5 holes testing extensions at 2 existing open pit resources
     All targets are on the mining leases, within 3km of the processing plant footprint
     Samples are currently being prepared for transport to the laboratory
 
watchlist Created with Sketch. Add AUN (ASX) to my watchlist
(20min delay)
Last
3.8¢
Change
-0.003(7.32%)
Mkt cap ! $16.78M
Open High Low Value Volume
4.0¢ 4.0¢ 3.7¢ $43.46K 1.100M

Buyers (Bids)

No. Vol. Price($)
2 34842 3.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.1¢ 150000 1
View Market Depth
Last trade - 15.21pm 03/05/2024 (20 minute delay) ?
Last
3.8¢
  Change
-0.003 ( 7.32 %)
Open High Low Volume
3.9¢ 3.9¢ 3.7¢ 184419
Last updated 15.21pm 03/05/2024 ?
AUN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.