Just on that, the last quarterly said the facility produced 4102 tonnes up 38% on the previous corresponding period. So a fair improvement. Olaroz stage 1 had a 17500 per annum design or 4375 tonnes per quarter, so they are not far from that. You may remember all those ponds they built were not entirely for stage 2. My understanding was the first of the new ponds were for stage 1 as it was identified that was an issue with not reaching nameplate.
Now you would think after building Olaroz stage 1 they would have stuffed a few things up, learnt from their mistakes and will have an even better facility this time around.
Brine certainly won't slow us down, there has been heaps sitting there evaporating for ages. AKE starting to string a few positive announcements together now. Congratulations on our 25000 facility, congratulations to management on this enormous achievement and remembering to inform the market. Must remember to thumbs up the announcement myself.
- Forums
- ASX - By Stock
- Ann: First Production Achieved at Olaroz Stage 2
Just on that, the last quarterly said the facility produced 4102...
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AKE (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online