GLA 13.3% 1.7¢ gladiator resources limited

Ann: FIRST RESULTS FROM KRODA DRILLING PROGRAM, page-2

  1. 2,475 Posts.
    lightbulb Created with Sketch. 855

    Highlights

    Drilling commenced at Kroda on 15TH November Six holes for 943 metres completed, 2 others in progress

    All holes encountered substantial intervals containingquartz vein fragments, coarse sulphide minerals and/orelevated arsenic and sulphur Mineralisation has now been intersected over 1.4 km ofstrike linking Kroda 3 and Kroda 4 and confirming asignificant mineralised system

     The first batch of samples has been despatched for fireassay gold determination and results are expectedwithin 2-3 week.


    Thats what we wanted tho hear !

    glah-salt

 
watchlist Created with Sketch. Add GLA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.