4m. The conveyor system will reduce the river level loading risk. Also it's been unseasonably dry for this time of year but this won't continue. Rising from lows now and more rains coming from up north in the high country.
On another tangent, progress on infrastructure at Batu looks good and likely will get additional contract miners with larger machinery to ramp up once the barges are running cyclically.
- Forums
- ASX - By Stock
- Ann: First Revenue from Coal Sales Pending Increased Water Levels
4m. The conveyor system will reduce the river level loading...
- There are more pages in this discussion • 44 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CKA (ASX) to my watchlist
|
|||||
Last
9.8¢ |
Change
0.001(1.03%) |
Mkt cap ! $105.7M |
Open | High | Low | Value | Volume |
10.0¢ | 10.0¢ | 9.8¢ | $19.69K | 197.6K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 18137 | 9.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.9¢ | 20000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 18137 | 0.098 |
1 | 54183 | 0.097 |
2 | 110526 | 0.095 |
1 | 100000 | 0.094 |
1 | 107000 | 0.093 |
Price($) | Vol. | No. |
---|---|---|
0.099 | 20000 | 1 |
0.100 | 149765 | 1 |
0.105 | 106753 | 1 |
0.110 | 1075865 | 7 |
0.115 | 297704 | 4 |
Last trade - 15.30pm 17/06/2024 (20 minute delay) ? |
|
|||||
Last
9.9¢ |
  |
Change
0.001 ( 1.02 %) |
|||
Open | High | Low | Volume | ||
10.0¢ | 10.0¢ | 9.8¢ | 86812 | ||
Last updated 15.36pm 17/06/2024 ? |
Featured News
CKA (ASX) Chart |
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non Executive Director
Simon Kidston
Non Executive Director
SPONSORED BY The Market Online