STA 0.00% 9.5¢ strandline resources limited

Ann: First Shipment of HMC Completed at Coburn Project, page-47

  1. 314 Posts.
    lightbulb Created with Sketch. 36
    MEDI ATLANTICO mooring in the next couple of hours.
    I notice that in addition to the DANZIGERGRACHT loading 5000t mineral sands concentrate (MSC) on the 18th Jan., two days later the TOMINI ZONDA is loading 8000t of heavy mineral concentrate (HMC).
    You will recall that Strandline described it's first shipment last month specifically as HMC and went on to say that haulage / storage of HMC at port facilities was continuing.
    I'm betting that it's this shipment that is Strandline's but would love to find that they have concentrate going out on all three vessels.
 
watchlist Created with Sketch. Add STA (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.