I wouldn't be so dismissive of rookstar ,they are laying out the facts but you don't want to believe it
The ship was due to depart 15 hours before the tidal surge caused it to go to anchor
The reduced loading rates was simply lack of iron ore in the shed
Go to Geraldton and look and a shed with next to nothing in it, the shed hasn't anywhere near enough to load that ship and it still wont have enough by tomorrow at current haulage rates
If they are so confident of having enough to load the ship then why in the quarterly did they not include there cost per tonne and the grade of the ore that's being shipped?
Simply put - They don't know there costs and they don't want to admit there grade
- Forums
- ASX - By Stock
- GWR
- Ann: First Shipment on Track as Iron Ore Stockpile Builds
Ann: First Shipment on Track as Iron Ore Stockpile Builds, page-401
-
- There are more pages in this discussion • 601 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.0¢ |
Change
-0.007(8.05%) |
Mkt cap ! $25.69M |
Open | High | Low | Value | Volume |
8.0¢ | 8.0¢ | 8.0¢ | $3.499K | 43.73K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.6¢ | 35000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 20000 | 0.080 |
1 | 100000 | 0.078 |
1 | 131578 | 0.076 |
1 | 41666 | 0.072 |
1 | 14285 | 0.070 |
Price($) | Vol. | No. |
---|---|---|
0.086 | 35000 | 1 |
0.087 | 59687 | 1 |
0.091 | 1260 | 1 |
0.100 | 29000 | 1 |
0.105 | 25001 | 1 |
Last trade - 12.17pm 15/07/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham / Dr Alan Dunton, MD & CEO / Non-Executive Director
James Graham / Dr Alan Dunton
MD & CEO / Non-Executive Director
SPONSORED BY The Market Online