Did we ever figure out if MSXT ATHENA was for us or FEX?
Trucking started around the 24th Dec. The PanAfrican departed on 9th Feb (~57 days getting ore to port). Next boat due on the 10th (that would be roughly 1mth since the PanAfrican left). Don't know if that boat is ours. I sure hope it is.
I'm sure they will figure out the trucking piece (they said it would ramp up).
https://www.theassay.com/news/gwr-commences-trucking-high-grade-ore-to-port/"My Lyons said haulage contractor QEM Group Australia Pty Ltd (QEM) will continue to ramp up the number of trucks required to meet complete Stage 1 within 12 months."
I haven't got a subscription, so I don't know if there's anything new in the below link but it's a good picture of the QEM truck
https://www.miningmonthly.com/transport/news/1402242/side-loader-to-truck-c4-ore
Like others say, it's just dig. - crush - truck - and ship. They should be able to figure this out.
- Forums
- ASX - By Stock
- GWR
- Ann: First Shipment on Track as Iron Ore Stockpile Builds
Ann: First Shipment on Track as Iron Ore Stockpile Builds, page-793
-
- There are more pages in this discussion • 209 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
|
|||||
Last
8.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.69M |
Open | High | Low | Value | Volume |
8.0¢ | 8.0¢ | 8.0¢ | $727 | 9.091K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 29999 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.4¢ | 85902 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 29999 | 0.080 |
1 | 10000 | 0.079 |
1 | 100000 | 0.078 |
1 | 131578 | 0.076 |
1 | 41666 | 0.072 |
Price($) | Vol. | No. |
---|---|---|
0.084 | 85902 | 1 |
0.085 | 200000 | 1 |
0.087 | 59687 | 1 |
0.091 | 1260 | 1 |
0.100 | 29000 | 1 |
Last trade - 10.04am 19/07/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |