BRK 0.00% 1.2¢ brookside energy limited

Frack stimulated wells always start flowback through temporary...

  1. 3,203 Posts.
    lightbulb Created with Sketch. 7537
    Frack stimulated wells always start flowback through temporary production facilities as happened for Jewell and Rangers. This is because the initial flowback of completion fluids is accompanied by a large amount of frack sand which has to be separated out. Permanent facilities are designed to separate out sand as well , but not in the amounts that occur at early flowback. Running the early flowback stage through permanent facilities will bugger them up ( excessive abrasion and sand blockages)so they use the temp facilities set up as part of the cleanup process. Once sand flow falls to the " normal" levels expected during production, they switch to producing from their permanent onsite facilities.

    Cheers

    Dan
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
0.000(0.00%)
Mkt cap ! $57.27M
Open High Low Value Volume
1.3¢ 1.3¢ 1.2¢ $9.061K 752.4K

Buyers (Bids)

No. Vol. Price($)
9 2605358 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 27608377 35
View Market Depth
Last trade - 14.50pm 25/07/2024 (20 minute delay) ?
BRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.