FLC fluence corporation limited

Ann: FLC Signs LOI to increase China Assembly, and Related MOU, page-23

  1. 864 Posts.
    lightbulb Created with Sketch. 1222

    The Changzhou plant will be producing to the capacity of 7,500 MABR units (3 shifts) by Q4 this year on the current 1 line. The Changzhou has the capacity to go up to 3 lines.

    I believe the assembly of the Aspiral containers are currently also done in the Changzhou facility, which clogs up valuable space for the other 2 lines. In addition, it also requires more areas to park the empty and loaded containers.

    The original plan during Emefcy days was for the Changzhou plant to produce MABR spirals only. I would imagine with the introduction of containerized product, the likes Yiyang assembly plants makes a lot of sense to alleviate the space constraints in Changzhou.

    I am seeing the plans will be our IP on MABR production remains in Changzhou, producing up to 3 lines in future, and assembly plants scattered in various cities.

    just a back of envelope “not so conservative” calculation now:

    from @Relax1 figure of $70,000 per L4 Aspiral unit, which requires 4 spirals of MABR.

    Current 7,500 MABR capacity in Changzhou will be able to produce 1,875 L4 units which will be a potential of a revenue of $131m

    That will be a big jump for our segment of Smart Package Solution.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.9¢
Change
-0.001(2.50%)
Mkt cap ! $42.32M
Open High Low Value Volume
4.1¢ 4.1¢ 3.9¢ $12.88K 328.7K

Buyers (Bids)

No. Vol. Price($)
1 270000 3.7¢
 

Sellers (Offers)

Price($) Vol. No.
4.0¢ 617698 2
View Market Depth
Last trade - 16.11pm 25/06/2025 (20 minute delay) ?
FLC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.