The concrete tubes are the makings of two reservoirs and are on an elevated position and located inside the city. You can see an existing reservoir at the same site so they be tapping into existing services. This site is purely for distribution via gravity and maybe some chlorination equipment.
The main site of the water treatment plant is the one that has been carved into the hill located near the Lagoon.
- Forums
- ASX - By Stock
- Ann: Fluence-Ivory Coast Project Conditions Precedent Met
The concrete tubes are the makings of two reservoirs and are on...
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FLC (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
-0.005(2.94%) |
Mkt cap ! $177.5M |
Open | High | Low | Value | Volume |
16.5¢ | 16.8¢ | 16.5¢ | $4.343K | 26.32K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 244189 | 16.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 670034 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 234189 | 0.160 |
2 | 119300 | 0.155 |
3 | 140500 | 0.150 |
2 | 43000 | 0.140 |
1 | 22000 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 670034 | 6 |
0.175 | 183965 | 3 |
0.180 | 229608 | 4 |
0.185 | 392997 | 8 |
0.190 | 470502 | 8 |
Last trade - 15.45pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
16.5¢ |
  |
Change
-0.005 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
16.5¢ | 16.5¢ | 16.5¢ | 28969 | ||
Last updated 12.41pm 03/05/2024 ? |
Featured News
FLC (ASX) Chart |