FLC fluence corporation limited

It looks like Aerospace Kaitian may have secured another...

  1. 530 Posts.
    lightbulb Created with Sketch. 824
    It looks like Aerospace Kaitian may have secured another contract for purchasing more Aspiral units in Guangxi Province this year, I would expect the contract value would be similar to this one if not more. President Xi just visited Wuhan yesterday which it has given strong signals that the lockdown of Hubei province will start to loose up in the coming days.

    The consortium of Guangxi Environmental Protection Industry Investment Group Co., Ltd. and Aerospace Kaitian Environmental Protection Technology Co., Ltd. pre-bid the eight PPP projects of eight town-level sewage treatment plants and supporting pipe network projects in Hengxian County, Guangxi. The unit price of operating water was 1.44 yuan / ton.

    The procurement scope of this project is eight town-level sewage treatment plants and supporting pipe network projects in Hengxian County. The treatment scale recently (2020) is 6400m³ / d, the plant covers an area of 40.98 mu, and the length of the sewage pipe network is about 33.63 kilometers.

    The total investment of the project is RMB 143,935,400, of which RMB 35,790,200 is for the construction project, RMB 30,823,000 is for the purchase of equipment and tools, RMB 39,507,700 for the installation, RMB 2,15,599,000 for other construction costs, RMB 8,671,200 for the construction period, and interest during the construction period. RMB 587.72 million and current capital of RMB 175.93 million.

    Mode of operation: BOT mode

    The cooperation period of this project is 11 years, counting from the effective date of the PPP project contract. Among them, the construction period is one year, and the project enters the operation period after the completion of the project. The operating period is 10 years. During the cooperation period, shortening or extending the actual construction period does not change the operating period. The project company is jointly established by the government funder's representative and the selected social capital party. The project company undertakes the investment (financing), design, construction, Operations maintenance and handover.

    http://huanbao.bjx.com.cn/news/20200310/1052530.shtml

    Last edited by willchang409: 11/03/20
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
4.1¢
Change
0.005(13.9%)
Mkt cap ! $44.49M
Open High Low Value Volume
3.7¢ 4.5¢ 3.7¢ $158.3K 3.729M

Buyers (Bids)

No. Vol. Price($)
2 109465 4.1¢
 

Sellers (Offers)

Price($) Vol. No.
4.2¢ 250000 1
View Market Depth
Last trade - 15.44pm 20/06/2025 (20 minute delay) ?
FLC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.