BRK 4.00% 1.2¢ brookside energy limited

• Major FMDP milestone achieved with the Rocket Well, the fourth...

  1. 43,641 Posts.
    lightbulb Created with Sketch. 92
    • Major FMDP milestone achieved with the Rocket Well, the fourth and final well of the transformational FMDP multi-well development program, successfully drilled and casing cemented in place.

    • Fabrication of surface production infrastructure commenced including installation of an 18-tank battery on the Sanford Pad.

    • All 4 FMDP wells were drilled ahead of schedule with zero HSE incidents with completion operations expected to commence in late July/early August.

    • Production and first sales anticipated by late Q3/early Q4 2024 growing Brookside’s Net production to 2,500 BOEPD (78% liquids), by Q4 2024.

    • The FMDP provides a key plank underpinning Brookside’s forecast to grow net production to 6,300 BOEPD by ~Q3 2028

    The wells were drilled ahead of schedule taking only 115 days to drill vs the projected drilling time of 136 days, 3 weeks ahead of schedule.

    The efficient and safe drilling of these wells, ahead of schedule, is a credit to our operations team and showcases Brookside's operational capability.

    good report

    how mainly small oilers can say this
    Last edited by Trees: 20/06/24
 
watchlist Created with Sketch. Add BRK (ASX) to my watchlist
(20min delay)
Last
1.2¢
Change
-0.001(4.00%)
Mkt cap ! $57.17M
Open High Low Value Volume
1.2¢ 1.2¢ 1.2¢ $324.9K 27.07M

Buyers (Bids)

No. Vol. Price($)
53 43394504 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.2¢ 1099195 1
View Market Depth
Last trade - 15.48pm 05/07/2024 (20 minute delay) ?
BRK (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.