MAY 4.35% 2.4¢ melbana energy limited

Hi Alexei,not sure if the N structure is Alameda itself. Marti 5...

  1. 1,826 Posts.
    lightbulb Created with Sketch. 762
    Hi Alexei,

    not sure if the N structure is Alameda itself. Marti 5 drilled through Alamada down flank 30 years ago, but likely not the N structure. Alameda 1 surface location is a few k's west of Marti 5, hence to clip the N structure. Looks like we may have a large oil field in N alone. 100% success rate is a good start in this neighbourhood

    https://hotcopper.com.au/data/attachments/4096/4096118-d7e0332a3197b6f940f1e1ea34086289.jpg



 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
2.4¢
Change
0.001(4.35%)
Mkt cap ! $80.88M
Open High Low Value Volume
2.4¢ 2.4¢ 2.3¢ $68.51K 2.960M

Buyers (Bids)

No. Vol. Price($)
4 338720 2.3¢
 

Sellers (Offers)

Price($) Vol. No.
2.4¢ 2244796 10
View Market Depth
Last trade - 16.10pm 26/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.