MAY 6.25% 3.0¢ melbana energy limited

Hi alexei, i just took it to mean if they don’t encounter the...

  1. 9,668 Posts.
    lightbulb Created with Sketch. 3046
    Hi alexei, i just took it to mean if they don’t encounter the top of the structure at prognosed depth, then the well design allows them to drill out the Alameda structure to a lower overall TVD. I’m a little confused as to how the “N structure is the the Alameda structure”. If that were the case, then one might assume N+A could form a much bigger singular structure?
    Last edited by jakspara: 17/02/22
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
3.0¢
Change
-0.002(6.25%)
Mkt cap ! $101.1M
Open High Low Value Volume
3.1¢ 3.1¢ 2.8¢ $248.3K 8.453M

Buyers (Bids)

No. Vol. Price($)
4 750509 2.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.0¢ 24364 1
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.