MAY 3.13% 3.3¢ melbana energy limited

Ann: Forward work program for Block 9 drilling program, page-9

  1. 3,626 Posts.
    lightbulb Created with Sketch. 1134
    That is a very satisfactory explanation of the upper sheet resource upgrade delay. Finally, thank you. I can live with that and look forward to it’s release either before or after the N logs.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.