PRU 1.57% $2.58 perseus mining limited

Ann: Full Year Production and Cost Guidance, page-6

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 4,312 Posts.
    lightbulb Created with Sketch. 1877
    Not dependent solely on exchange rate. As John points out the current costs include the relocation housing project which I think is probably more than $100/oz at the moment. That should start to come down toward the end of calendar 2016.

    They have a habit of beating costs forecasts in the last 12 months after previously over-promising.

    If they produce 110,000 oz in the second half I'd be surprised if costs aren't below $1000 even with the housing project.
 
watchlist Created with Sketch. Add PRU (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.