"Like all batteries it can discharge slower."
So what the CEC and DOE and Energy Queensland wants from electrochemical storage is just a manipulated apparition.
And this, this is money for smoke and mirrors;
From https://www.energy.gov/oced/long-duration-energy-storage-demonstrations-0
Especially this one;
From https://www.energy.gov/oced/long-duration-energy-storage-demonstrations-projects-selected-and-awarded-projects
And with regard to this, "EXACTLY what Redflow batteries are designed for" yes, but Redflow needs to deliver a new more energy dense larger format product and build a new far more automated factory to be able to compete price wise, and to be able to deliver that kind of manufactured volume in a sensible time. And that is what the CEC and DOE funded projects are designed to try and bootstrap as they increase in size for the progressing recipients.
- Forums
- ASX - By Stock
- RFX
- Ann: Funding approved for US Barona 6.6 MWh LDES project
Ann: Funding approved for US Barona 6.6 MWh LDES project, page-14
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.9¢ |
Change
0.001(1.14%) |
Mkt cap ! $23.52M |
Open | High | Low | Value | Volume |
8.9¢ | 9.3¢ | 8.8¢ | $11.41K | 128.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 453 | 8.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.0¢ | 24154 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 453 | 0.089 |
1 | 1595 | 0.087 |
1 | 11716 | 0.085 |
3 | 72114 | 0.084 |
4 | 101259 | 0.083 |
Price($) | Vol. | No. |
---|---|---|
0.092 | 7177 | 1 |
0.094 | 82350 | 2 |
0.097 | 50000 | 1 |
0.100 | 206450 | 2 |
0.105 | 27534 | 2 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
RFX (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online