Could probably do 50kw for 120hrs … or xxx or xxx etc etc But. … engineering specified as a 4hr battery.
if you just needed to meet an 8hr spec’d battery you’d save half the cost of the inverters and S build a 8hr battery. But that’s not what the customer wants. Hence Redflow built a 4hr battery. Are you really so dim you can’t understand this?
- Forums
- ASX - By Stock
- Ann: Funding approved for US Barona 6.6 MWh LDES project
Could probably do 50kw for 120hrs … or xxx or xxx etc etc But. …...
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RFX (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.7¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.63M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
RFX (ASX) Chart |
Day chart unavailable
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, MD & CEO
Anthony Noble
MD & CEO
Previous Video
Next Video
SPONSORED BY The Market Online