Sorry, I think I may have been unclear. Not claiming there is an overbuild. Rather, trying to say that the sensible planned solution to sourcing winter solar for NSW and Vic, is to overbuild solar in Qld as solar built in northern Qld produces 1.5 time the winter solar as that built in NSW and more in Vic. Managing that asset in the summer will be tricky, but suggests lots of batteries to time shift.
- Forums
- ASX - By Stock
- Ann: Funding Package and JDA Agreed with J-POWER
Sorry, I think I may have been unclear. Not claiming there is an...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GNX (ASX) to my watchlist
|
|||||
Last
27.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $373.9M |
Open | High | Low | Value | Volume |
27.0¢ | 27.3¢ | 27.0¢ | $610.6K | 2.261M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
11 | 3191937 | 27.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
27.5¢ | 4340724 | 41 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 3191937 | 0.270 |
31 | 12529311 | 0.265 |
2 | 6600 | 0.260 |
1 | 40000 | 0.255 |
1 | 10000 | 0.250 |
Price($) | Vol. | No. |
---|---|---|
0.275 | 4340724 | 41 |
0.280 | 2199088 | 14 |
0.285 | 99065 | 4 |
0.290 | 31940 | 4 |
0.295 | 124962 | 2 |
Last trade - 16.10pm 20/06/2024 (20 minute delay) ? |
Featured News
GNX (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online