Not at all, they took a project that wasn't operating efficiently and turned it into a high output, low impurity, low cost operation, increasing spod prices helped pad out the balance sheet but it's also profitable at current prices.
Every AJM shipment was subject to abatement due to grade and impurity, AJM use to use a contract price to report not a realized price it how they sort of claimed to not be selling below floor.
- Forums
- ASX - By Stock
- SYA
- Ann: Further high-grade drill results at North American Lithitium
Ann: Further high-grade drill results at North American Lithitium, page-78
-
- There are more pages in this discussion • 12 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SYA (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.5¢ |
Change
-0.001(3.85%) |
Mkt cap ! $257.3M |
Open | High | Low | Value | Volume |
2.7¢ | 2.8¢ | 2.5¢ | $1.027M | 39.76M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
88 | 11401312 | 2.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 453541 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
87 | 11361312 | 0.025 |
62 | 14170535 | 0.024 |
29 | 8199780 | 0.023 |
21 | 4196409 | 0.022 |
15 | 2975067 | 0.021 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 453541 | 3 |
0.027 | 7043217 | 17 |
0.028 | 7765316 | 37 |
0.029 | 6235309 | 26 |
0.030 | 6146497 | 45 |
Last trade - 16.10pm 03/09/2024 (20 minute delay) ? |
Featured News
SYA (ASX) Chart |