Whilst I have long held the view that Ganfeng may try and take out Goulamina, I hope the structure and register post whatever happens with FFX parcel prevents any t/o opportunity.
The optimum way for holders to achieve this highest value for their LLL stake is to see the $$ flow from production and sales. Too often, SH that have funded exploration, DFS and early construction phases get a minor premium for small piece of the pie...
The consensus on LTR threads are that no SH want the $2.5 offered by Albermarle as it significantly undervalues future value, however I believe they will still get taken out at some stage before the real revenue flows from production.
- Forums
- ASX - By Stock
- LLL
- Ann: Further High-Grade Drilling Results at Goulamina
Ann: Further High-Grade Drilling Results at Goulamina, page-130
-
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $605.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online